Bonita Way/Garry Oak Drive/Twin Oaks Avenue Storm Drain Project

Project Description:

The Bonita Way/Garry Oak Drive/Twin Oaks Avenue Storm Drain Project is part of the Neighborhood Areas 8, 9, and 10 Storm Drain Master Plan. 

  • The Bonita Way portion of the project will install new storm pipe from Dow Avenue along Bonita with an outlet on Old Auburn just before Mariposa Creek. It will provide proper conveyance of stormwater runoff and help reduce localized street flooding.
  • The Garry Oak Drive (near Sylvan Oak Way) portion of the project will replace a undersized storm drain that has historically caused flooding in the neighborhood.
  • The Twin Oaks Avenue portion of the project is at the northwest corner of Sunrise Boulevard and Twin Oaks Avenue. It includes curb, gutter, sidewalk, storm drain inlet, and culvert rehabilitation. 

Project Status:

This project is funded through Storm Water Utility Funds and will begin construction this Summer (2021). 

Contact:

For questions about the project, please contact the General Services Department at 916-727-4770.

Page last updated July 7, 2021.